Construction continues on the Henderson Building. Since the last post all cutting, fitting, filling, painting, mortar lines, and weathering on the outside have been completed. I've also added the interior window treatment and I'm presently working on the lighting (thus the wire hanging out)
In this picture (sorry for all the junk) I've attached the back and two side walls together. I'll leave the front off for access during the lighting phase. I haven't painted the store front yet and will do that later.
I'm trying something new for the lighting - a "light tunnel". I used foam board to create a box the entire height of the building. I cut out openings on all sides for all floors and covered the openings with translucent velum paper printed with a wallpaper pattern. I added horizontal pieces for each floor covered with wood grain. The lighting will actually be multiple lights hung down from the top inside of the box to provide a glow through the translucent paper. The idea is to make sure that you can't see any "naked" light bulbs. I've yet to add some "walls" on each floor that will act as view blocks so that you can't see through the building from one side to the other.
More to come.......
Wednesday, October 20, 2010
Subscribe to:
Post Comments (Atom)
How about an update on the Henderson Building?
ReplyDeleteScott,
ReplyDeleteA got a little off course as nothing has been done to the Henderson Building. I've been working on the foreground of Hoovertown - check out: http://model-railroad-hobbyist.com/node/3838#comment-30578
Rick