Saturday, February 20, 2010
Nice picture of loco 2509 crossing the trestle
Sunday, February 14, 2010
Bash-O-Mania!
Here's the front after modification. I've added two stories, removed the overhead door to replace it with walk thru door, and narrowed the entire face (notice the kit before modification is 5 windows wide and it is now 4 windows wide.)
I hated those funky little small side windows on each side, so I cut up the sides to add the two stories and remove those windows.
Here's the side with the windows removed and about 1/3 of the width also removed. There won't be any side windows now on the ground floor.
Here you can see all four sides after the modifications. Notice that the back was narrowed by removing the entire far right side of windows from top to bottom.
Expansion planning on the railroad
I had been going about it all wrong in that I sort-of designed the future benchwork first, when it should be that I start with the purpose of the railroad and the industries it services. Here's some of Scott's comments on the planning process:
"Here is an industry diagram. I put in some of the industries, but not all. The ones I didn't put in didn't have another industry on the line to ship to. These can be added at will since all traffic to and fro is generated off line. Basically, the more of these types you use the more hidden staging you'll need. The industries I used keep all the traffic on the layout proper.
Here's a diagram.
This is a pretty busy railroad! Just the coal mine will generate two trains per ops session. Lots of back and forth. The asbestos plant sound like something you really want to build, so figure out a customer for it. An insulation company or a brake parts company would work. Worst case, ship it to the freight house. The coal distributor can sell gravel, too. A small cement plant is a great customer.
On the far right I always put the railroad as they consume a lot of goods; gravel, fuel, oil, sand, etc.
My rule of thumb is that every industry should have at least one supplier or destination on the railroad. This way more traffic stays on the board.
If you add the brewery or the bakery, you need to add a grain silo somewhere."
This is Scott's diagram that he furnished from the list of industries I provided to him. Click on the picture for a larger view.
This is an exciting process! This Friday the NCIOG group is meeting at the first time at my home for a planning session and we have a great start with Scott's input. Stay tuned for more!
Wednesday, February 10, 2010
New book for Richlawn RR Library
Saturday, January 30, 2010
The right tool for the job
Check out the description & specs here:
www.minicrafttools.com/38070.html
I've already made some cuts with it in plastic using a 24 tooth carbide blade and it rocks! The only disadvantage is the width of the cut, which has to be taken into consideration. What used to take what seems forever with a hand saw now takes less than 10 seconds!
Friday, January 29, 2010
Bits & Pieces
Bash-0-mania - I'm working on kit bashing a DPM building, #10400. This is my first serious attempt at kit bashing and so far, so good. I'm changing the building from a 3-story to a 5-story, along with replacing the overhead door with a regular door and cutting down the depth of the building. I've been hand sawing the pieces and have put the project on hold until my new Proxxon FKS mini power table saw arrives. The project is taking some time because besides hand cutting the pieces, I've been documenting the project with pictures as I progress.
Saturday, January 23, 2010
Work night at Steve's 1-22-10
Paul brought his "gun" and did the honors on securing the wall base plate to the floor.
I took my turn with the screw gun as Bob didn't want to hog all of the fun.
Saturday, January 16, 2010
Paul's Work Session 1-10-10
Since I haven't seen trains running on the layout, Paul was nice enough to run a loco around to show how well it tracks on his beautiful graceful curves & trackwork. I wonder if we should always start (or end) our Friday night sessions with some trains running (when possible).
Keith is hard at work making the wall angle brackets for the shelf on the upper portion of the layout by using a completed unit as a guide.
Mark worked closely with Keith and the two worked very well together. Ken is taking care of the glue situation as Bob looks on.
What's Bob so happy about??? GLUE!!! He about wet himself when he saw a HUGE bottle of TiteBond!
Friday nights are about fun as much as work. Mark enjoys Glue Bob's reaction to that sticky stuff.
Paul explains things to the crew for attaching the angle brackets to the wall. What you can't see is that Keith had just finishing threatening to slap me for a "supposed" smart remark. Can you believe that I would ever make a smart remark?
Here the guys are attaching the bracket to the top of the benchwork. The 22 caliber nail set was used to attach the other end to the concrete - POW!
It's always nice to have an extra set of hands. Bob was nice to take this picture so that nobody thinks I was just standing around all night eating yummy ham sandwiches.
While everybody else disappeared SOMEBODY has to do the work, so that's me. (Actually a posed picture)
Here I am again WORKING. (Another posed picture shot with the self-timer).
Ken & Steve got the boring job....get it? Lots of holes to be drilled and Steve actually drilled the edge off of the paddle bit.
Now where does this wire go??? Ken quickly figured it out and strung a bunch-o-wire.
Paul in deep thought....or day dreaming about his future empire?
Bob's working with the yellow 12/3 that will be used to hook up the 3-way switches for the layout lighting.
Who left this wire here? (ANOTHER posed picture).
Wire everywhere. The loco cable and the 12/3 got installed on the layout.
